After several months of working with West Chester Borough, Providence Church finally received Land Development approval and now construction is ready to begin. The project began to take shape in the late spring of 2018 when the Church made a presentation to the Borough with some conceptual drawings. The Church then approached D.L. Howell to prepare a sketch plan and attend a Planning Commission Meeting. While working with the Borough the plan incorporated changes to the “West End” of town by incorporating improvements to the streetscape with new sidewalk, landscaping and decorative streetlights. As the plan developed, the Church was required to amend their Special Exception approval allowing them to expand the assembly area within their new addition. D. L. Howell finalized the Land Development Plans and worked with the Borough and their Consultants to resolve all review comments. After working through the Planning Commission and Smart Growth Council, approval was granted by Borough Council on May 15th and the project received Final approval.

D.L. Howell worked closely with the project team including; Rob Fenza and Tony Stancato of Providence Church, Don Turner of Unruh, Turner, Burke & Frees Attorneys, Paul Sgroi of Bernardon Architecture, and Patrick Stuart of Orsatti & Stuart Landscape Architects, to refine the plans throughout the approval process. The project plans include detailed grading, utilities, erosion control, storm water management, site details, site lighting, landscaping and PADOT Highway Occupancy drawings. D. L. Howell is fortunate to be selected as the Civil Engineer on this project.